Metalfer Steel, Serbia
20kV, ±30Mvar
The equipment is installed in a Serbian steel plant, and is mainly used to improve the power factor, control flicker and improve the three-phase balance.
Due to the impact on the host network of the operation of the steel plant there was a risk that the power supply of the Serbian steel plant would be cut off and the production impacted if the project cannot be handed over on time. RXHK signed this contract under the pressure of a tight schedule, and completed the engineering design, manufacture and installation on schedule to solve the employer’s emergency, and in so doing won the customers praise.